Quantity estimators — ZetaStruct
Take-off pages for slab, beam, column, CHB wall, box culvert, footing, excavation & backfill, plastering, tiles, painting, ceiling, formwork, lumber, roofing and stairs: concrete, steel, masonry, finishes and earthwork quantities. This is an interactive tool for signed-in members (Pro and Max plans), so its working screens are not readable without an account; the description below is the public documentation for it.
Basis: Volumetric take-off with cement-factor mix proportions and commercial bar lengths.
Controls common to every estimator
- Cement factor [bags/m³] — Mix richness. Sets the cement, sand and gravel per cubic metre.
- Splice length [m] — Lap added at each bar splice; increases the total steel length.
- Length / piece [m] — Commercial bar length being bought, which decides how many pieces the cut length needs.
- Bar Ø [mm] — Bar size, which converts length to mass.
- Length / cut [m] — Tie-wire length used per tie.
- Quantity cards — Concrete volume with the cement/sand/gravel split, steel by diameter, and tie wire by mass.
Slab estimate
- Slab area / Thickness — Plan area (m²) and thickness (mm) giving the concrete volume.
- No. of structures — Repeat count — the whole take-off is multiplied by it.
- No. of pieces — Bars required per direction.
Beam estimate
- Length / Width / Height — Beam length, width and height, giving the concrete volume per beam.
- No. of beams — How many identical members; the whole take-off is multiplied by it.
- Length / stirrup / Stirrups / beam / Stirrup Ø — Stirrup take-off — cut length, count per beam, and size.
Column estimate
- Length / Width / Height / No. of columns — Column dimensions and count.
- Bars / column — Number of longitudinal bars, which sets the total bar length and mass.
- Length / tie / Ties / column / Tie Ø — Tie cut length, number of ties per column and the tie diameter.
CHB wall estimate
- Gross wall area / Openings area [m²] — Net block area is gross minus openings.
- CHB size — Block size, which sets blocks per m² and the mortar volume.
Box culvert estimate
- Gross x-section area / Opening area / Length — Cross-section and barrel length giving the concrete volume.
- No. top bars / Top bar Ø / Top bar length — Number, diameter and cut length of the top bars.
- No. U-bars / U-bar Ø / U-bar length / Spacing — Number, diameter, cut length and spacing of the U-bars.
Footing estimate
- L / B / Thickness / No. of footings — Plan size, thickness and count giving the concrete volume.
- Bar Ø / Spacing / Cover — The bottom mat both ways; bar counts and cut lengths follow from the cover and spacing.
- Quantities — Concrete with cement / sand / gravel, bars along L and along B cut from stock, tie wire.
Excavation and backfill
- Footing size / Depth / Working space / Side slope — The pit, by the prismoidal formula.
- Footing thickness / Column stub — What goes back into the pit, subtracted from the backfill.
- Swell / Shrinkage / Truck capacity — Bank, loose and compacted volume factors and the truck size for hauling.
Plastering estimate
- Area / Thickness / Waste — Mortar volume = area × thickness × (1 + waste).
- Mortar class — A 1:2 to D 1:5, setting the cement bags per m³ (sand 1.0 m³ per m³).
Tile estimate
- Area / Tile size / Joint / Waste / Tiles per box — Tiles by the tile-plus-joint module, boxed.
- Setting — Tile adhesive by coverage per bag, or a 1:4 cement-sand bed by thickness.
- Grout depth — Grout from the joint volume at 1.6 kg/L.
Painting estimate
- Area / Waste — The painted area and an allowance.
- Coats and coverage — Finish and primer coats at m² per gallon per coat; skim coat at m² per kg.
Ceiling estimate
- Room L × W / Board size / Waste — Ceiling boards over the room area.
- Carrying and furring spacing / Stock lengths — Channels, wall angle, hangers, clips and screws for the frame.
Formwork estimate
- Contact area / Waste — The concrete faces formed.
- Sheet size / Uses — Plywood sheets spread over the number of reuses.
- Lumber bd ft per m² / Nails kg per m² — Frame and nail allowances per m² of contact, editable.
Lumber board feet
- Pieces / Thickness / Width / Length — Up to six items; board feet = pieces × t × w × L / 12.
- Price per board foot — Gives the cost of the list.
Roofing estimate
- Ridge / Run / Pitch / Overhang — A gable roof: slope length and area.
- Sheet type — Long-span cut to length, or corrugated lapped along the slope.
- Effective width / Purlin spacing / Ridge roll — Sheets across, purlin lines, ridge roll pieces and screws.
Stair estimate
- Risers / Riser / Tread / Width / Waist / Landing — A straight flight: waist slab, triangular steps and landing.
- Main and distribution bars / Cover / Anchorage — Main bars along the slope, distribution bars across, cut from stock.